信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2024/7/22)
試題1
( )is the process of obtaining the stakeholders' formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.
A. Project acceptance
B. Scope verification
C. Scope definition
D. WBS Creation
查看答案
試題參考答案:B
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題2
假設(shè)甲、乙二人合作開發(fā)了某應(yīng)用軟件,甲為主要開發(fā)者。該應(yīng)用軟件所得收益合理分配后,甲自行將該軟件作為自己獨(dú)立完成的軟件作品發(fā)表,甲的行為( )。
A. 不構(gòu)成對(duì)乙權(quán)利的侵害
B. 構(gòu)成對(duì)乙權(quán)利的侵害
C. 已不涉及乙的權(quán)利
D. 沒有影響乙的權(quán)利
查看答案
試題參考答案:B
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題3
項(xiàng)目經(jīng)理向客戶推薦了四種供應(yīng)商選擇方案。每個(gè)方案損益值已標(biāo)在下面的決策樹上。根據(jù)預(yù)期收益值,應(yīng)選擇設(shè)備供應(yīng)商( )。
A.1
B.2
C.3
D.4
查看答案
試題參考答案:A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題4
乙公司中標(biāo)承接了甲機(jī)構(gòu)的網(wǎng)絡(luò)工程集成項(xiàng)目,在合同中約定了因不可抗力因素導(dǎo)致工期延誤免責(zé)的條款,其中不會(huì)被甲機(jī)構(gòu)認(rèn)可的不可抗力因素是(1),合同約定,甲乙雙方一旦出現(xiàn)分歧,在協(xié)商不成時(shí),可提交到相關(guān)機(jī)構(gòu)裁定,一般優(yōu)先選擇的裁定機(jī)構(gòu)是(2)
(1)A、施工現(xiàn)場(chǎng)遭遇長(zhǎng)時(shí)間雷雨天氣
B、物流公司車輛遭遇車禍
C、乙方施工隊(duì)領(lǐng)導(dǎo)遭遇意外情況
D、施工現(xiàn)場(chǎng)長(zhǎng)時(shí)間停電
(2)A、甲機(jī)構(gòu)所在地的仲裁委員會(huì)
B、乙公司所在地的仲裁委員會(huì)
C、甲機(jī)構(gòu)所在地的人民法院
D、乙公司所在地的人民法院
查看答案
試題參考答案:C、A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題5
某電池廠生產(chǎn)甲、乙兩種型號(hào)產(chǎn)品(單位:萬(wàn)個(gè)),這兩種產(chǎn)品都需要設(shè)備和A、B兩種原材料,利潤(rùn)與資源限制條件如表所示,為了獲得最大的利潤(rùn),該電池廠每天生產(chǎn)的甲產(chǎn)品的數(shù)量應(yīng)為( 1 )萬(wàn)個(gè),此時(shí)該企業(yè)每天的利潤(rùn)為( 2 )萬(wàn)元。查看答案
試題參考答案:A、D
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題6
At the project establishment stage , the feasibility study mainly includes techinical feasibility analysis , (), operation environment feasibility analysis and other aspects of feasibility analysis.查看答案
試題參考答案:C
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題7
以下工程進(jìn)度網(wǎng)絡(luò)圖中,若結(jié)點(diǎn)0和6 分別表示起點(diǎn)和終點(diǎn),則關(guān)鍵路徑為( )。
A.0→1→3→6
B.0→1→4→6
C.0→1→2→4→6
D.0→2→5→6
查看答案
試題參考答案:C
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題8
The receiving activities conduct analyses of the requirements with the requirements provider to ensure that a compatible, shared understandin is reached on the meaning of the requirements. The result of this analysis and dialog is an ( )set of requirements.
A. agreed-to
B. agree-to
C. agree-to-do
D. agree-with
查看答案
試題參考答案:A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題9
有8口海上油井,相互間距離如下表所示(單位:海里)。其中1號(hào)井離海岸最短長(zhǎng)度,為5海里,先要從海岸經(jīng)1號(hào)井鋪設(shè)油管將各井連接起來,則鋪設(shè)輸油管道的最短長(zhǎng)度()海里。查看答案
試題參考答案:D
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
試題10
根據(jù)合同法的相關(guān)條款,下面敘述,( )是錯(cuò)誤的。
A、合同解除后,己經(jīng)履行的,根據(jù)履行情況和合同性質(zhì),當(dāng)事人可以要求恢復(fù)原狀、采取其他補(bǔ)救措施,并有權(quán)要求賠償損失
B、當(dāng)事人互負(fù)到期債務(wù),該債務(wù)的標(biāo)的物種類、品質(zhì)相同的,一般情況下任何一方可以將自己的債務(wù)與對(duì)方的債務(wù)抵銷
C、當(dāng)事人互負(fù)債務(wù),標(biāo)的物種類、品質(zhì)不相同的,均不可以抵銷
D、當(dāng)事人采用信件、數(shù)據(jù)電文等形式訂立合同的,可以在合同成立之前要求簽訂確認(rèn)書
查看答案
試題參考答案:C
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2024/7/22
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |