信息系統(tǒng)項(xiàng)目管理師每日一練試題內(nèi)容(2025/9/24)
試題1
Advancements in ()have contributed to the growth of the automotive industry through the creation and evolution of self-driving vehicles.查看答案
試題參考答案:A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題2
The project maintains a current and approved set of requirements over the life of the project by doing the following:
? ( )all changes to the requirements
? Maintaining the relationships among the requirements, the project plans, and the work products
? ……
A. Monitoring
B. Managing
C. Gathering
D. Reducing
查看答案
試題參考答案:B
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題3
某項(xiàng)目包含A、B、C三項(xiàng)主要活動(dòng),項(xiàng)目經(jīng)理在成本估算時(shí)采用自下而上的估算方法,分別估算出三項(xiàng)活動(dòng)的成本分別為13萬元,23萬元和8萬元,同時(shí)為了應(yīng)對(duì)未來可能遇到的不確定因素,預(yù)留了10萬元的管理儲(chǔ)備,同時(shí)為每個(gè)活動(dòng)預(yù)留了2萬元的準(zhǔn)備金,該項(xiàng)目的總預(yù)算為( 1 )萬元。項(xiàng)目進(jìn)行到第二個(gè)月時(shí),實(shí)際花費(fèi)為20萬元,完成總工作量的30%。如果項(xiàng)目按照當(dāng)前的績(jī)效繼續(xù)進(jìn)行下去,預(yù)測(cè)項(xiàng)目的完工尚需成本ETC約為( 2 )萬元
(1)A、44
B、54
C、60
D、50
(2)A、46.7
B、40.7
C、45
D、46
查看答案
試題參考答案:C、A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題4
合同可以變更,但是當(dāng)事人對(duì)合同變更的內(nèi)容約定不明確的,推定為( )。
A.未變更
B.部分變更
C.已經(jīng)變更
D.變更為可撤銷
查看答案
試題參考答案:A
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題5
根據(jù)《軟件工程術(shù)語GB/T11457-2006》,基線是已經(jīng)過正式審核與同意,可用作下一步開發(fā)的基礎(chǔ),并且只有通過正式的修改管理步驟方能加以修改的規(guī)格說明或產(chǎn)品。對(duì)于配置管理,有以下三種基線:功能基線、( )和產(chǎn)品基線。
A.編碼基線
B.測(cè)試基準(zhǔn)
C.里程碑
D.分配基線
查看答案
試題參考答案:D
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題6
If the approved change requests have an effect on the project scope, then the corresponding component documents and cost baselines, and( ) of the project management plan. Are revised and reissued to reflect the approved changes
A、developing baselines
B、testing baselines
C、schedule baselines
D、ending baselines
查看答案
試題參考答案:C
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題7
某地政府采取詢價(jià)方式采購網(wǎng)絡(luò)設(shè)備,( )是符合招投標(biāo)法要求的。
A.詢價(jià)小組由采購人的代表和有關(guān)專家共8人組成
B.被詢價(jià)的A 供應(yīng)商提供第一次報(bào)價(jià)后,發(fā)現(xiàn)報(bào)價(jià)有誤,調(diào)整后提交了二次報(bào)價(jià)
C.詢價(jià)小組根據(jù)采購需求,從符合資格條件的供應(yīng)商名單中確定三家供應(yīng)商,并向其發(fā)出詢價(jià)通知書讓其報(bào)價(jià)
D.采購人根據(jù)符合采購需求、質(zhì)量和服務(wù)相等且報(bào)價(jià)最低的原則確定成交供應(yīng)商,最后將結(jié)果通知成交供應(yīng)商
查看答案
試題參考答案:C
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題8
項(xiàng)目進(jìn)行到某階段時(shí),項(xiàng)目經(jīng)理進(jìn)行績(jī)效分析,計(jì)算出CPI值為1.09,這表示()
A、每花費(fèi)109元人民幣,只創(chuàng)造相當(dāng)于100元的價(jià)值
B、每花費(fèi)100元人民幣,可創(chuàng)造相當(dāng)于109元的價(jià)值
C、項(xiàng)目進(jìn)展到計(jì)劃進(jìn)度的109%
D、項(xiàng)目超額支出9%的成本
查看答案
試題參考答案:B
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題9
根據(jù)《中華人民共和國(guó)著作權(quán)法》,( )是不正確的。
A.創(chuàng)作作品的公民是作者
B.由法人或者其他組織主持,代表法人或者其他組織意志創(chuàng)作,并由法人或者其他組織承擔(dān)責(zé)任的作品,法人或者其他組織視為作者
C.如無相反證明,在作品上署名的公民、法人或者其他組織為作者
D.改編、翻譯、注釋、整理已有作品而產(chǎn)生的作品,其著作權(quán)仍歸原作品的作者
查看答案
試題參考答案:D
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
試題10
在面向?qū)ο箝_發(fā)方法中,()是指同一消息發(fā)送給不同的對(duì)象,會(huì)有不同的響應(yīng)
A、抽象
B、多繼承
C、動(dòng)態(tài)
D、多態(tài)
查看答案
試題參考答案:D
試題解析與討論:www.ichunya.com/exam/ExamDay.aspx?t1=1&day=2025/9/24
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |