1、Developing the project schedule is often an iterative process. It determines the planned start and finish dates for project activities and milestones. Schedule development can require the review and revision of duration estimates and resource estimates to create an approved project schedule that can serve as a baseline to ( ) progress.
A. analyze
B. track
C. level
D. extend
信管網(wǎng)解析:
開發(fā)項目進度表通常是一個迭代過程。它確定項目活動和里程碑的計劃開始和結(jié)束日期。進度計劃的制定可能需要對工期估算和資源估算進行審查和修訂,以創(chuàng)建一個批準(zhǔn)的項目進度計劃,作為()進度的基線。
A、 分析
B、 軌道
C、 水平
D、 擴展
信管網(wǎng)參考答案:B
2、The ( ) is a general description of the architecture of a workflow management system used by the WFMC, in which the main components and the associated interfaces are summarized. The workflow enactment service is the heart of a workflow system which consists of several .()
(1)
A. waterfall model
B. workflow reference model
C. evolutionary model
D. spiral model
(2)
A. workflow engines
B. processes
C. workflow threads
D. tasks
信管網(wǎng)解析:
()是WFMC使用的工作流管理系統(tǒng)架構(gòu)的一般描述,其中總結(jié)了主要組件和相關(guān)接口。工作流執(zhí)行服務(wù)是由多個工作流系統(tǒng)組成的工作流系統(tǒng)的核心
(一)
A、 瀑布模型
B、 工作流參考模型
C、 進化模型
D、 螺旋模型
(二)
A、 工作流引擎
B、 過程
C、 工作流線程
D、 任務(wù)
信管網(wǎng)參考答案:B、A
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請以權(quán)威部門公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,官方教材參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學(xué)員考試保駕護航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評論 查看完整評論 | |